top of page
fitout1 reduced.jpg

setting out the shelving

fitout2 copy.jpg

setting out all the new tools

ramp 1 reduced.jpeg

Building the entry ramp

clamp corner copy.jpg

Clamp corner

Ramp -  Pat finishing reduced.jpeg

Adding the railing

tools on wall.jpeg

The wall of tools

disabled parking copy.jpg

The disabled parking

opening cake copy.jpg

 Cutting the cake at the opening of the new Mens Shed. Local member Tamara Smith, councillor Sharon Cadwallor and club President Pat.

opening2 cutting ribbon copy.jpg

Trying to cut the ribbon!

entry tarmac.j peg copy.jpg

Even after opening the fitting out continues.  The gate entry is tarmaced to comply with council requirements

ramp1 copy.jpg

A covered ramp complex is being constucted connecting the old and new shed with the disabled parking

ramp connecting1 copy.jpg
ramp2 copy.jpg
ramp5 copy.jpg
bottom of page